| Dir | Post Miles |
Date / Time | Begin & End Limit | Estimated Delay (minutes) |
Closure Type | Work Description | Lanes Closed | Total Lanes | |
|---|---|---|---|---|---|---|---|---|---|
| Start | End | ||||||||
| EB | 1.144 1.144 |
11/24/2026 07:01 PM | 11/25/2026 05:59 AM | Route 80 Route 29 |
Full | Striping Operation | All | 2 | |
| WB | R26.608 R26.608 |
11/24/2026 07:01 PM | 11/25/2026 03:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| EB | R25.862 R25.862 |
11/24/2026 07:01 PM | 11/25/2026 03:59 AM | Hickory Lane Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | R26.306 R26.306 |
11/24/2026 08:01 PM | 11/25/2026 03:59 AM | Cliffside Dr Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | R26.608 R26.608 |
11/24/2026 09:01 PM | 11/25/2026 03:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| EB | 1.144 1.144 |
11/25/2026 07:01 PM | 11/26/2026 05:59 AM | Route 80 Route 29 |
Full | Striping Operation | All | 2 | |
| EB | 1.144 1.144 |
11/26/2026 07:01 PM | 11/27/2026 05:59 AM | Route 80 Route 29 |
Full | Striping Operation | All | 2 | |
| EB | 1.144 1.144 |
11/27/2026 07:01 PM | 11/28/2026 05:59 AM | Route 80 Route 29 |
Full | Striping Operation | All | 2 | |
| WB | 6.814 5.634 |
11/30/2026 09:01 AM | 11/30/2026 05:01 PM | Hunter Hill Rest Area Route 37 |
Lane | Median Barrier Work | #4, Right Shoulder | 4 | |
| WB | 4.432 4.432 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| WB | R26.608 R26.608 |
11/30/2026 07:01 PM | 12/01/2026 04:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| EB | R25.862 R25.862 |
11/30/2026 07:01 PM | 12/01/2026 04:59 AM | Hickory Lane Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | 3.3 3.3 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 1.776 1.776 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Magazine St |
Full | Striping Operation | All | 1 | |
| WB | 3.597 3.597 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| EB | 4.432 4.432 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | 4.502 4.502 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 WB Redwood St/EB Redwood Pkwy |
Full | Striping Operation | All | 1 | |
| EB | 1.73 1.73 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 MAGAZINE STREET |
Full | Striping Operation | All | 1 | |
| EB | R26.022 R26.022 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Davis St Route 80 |
Full | Striping Operation | All | 1 | |
| EB | 3.597 3.597 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 4.432 4.432 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | R28.076 R28.076 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Orange Dr |
Full | Striping Operation | All | 1 | |
| WB | 1.26 1.26 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Maritime Academy Rd |
Full | Striping Operation | All | 1 | |
| EB | 2.446 2.446 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 BENICIA ROAD |
Full | Striping Operation | All | 1 | |
| EB | 1.238 1.238 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Sequoia Ave |
Full | Striping Operation | All | 1 | |
| EB | 2.881 2.881 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | 3.444 3.444 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Humbolt St/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 23.958 23.958 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Pena Adobe Rd/Pleasants Valley Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.494 3.494 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Tennessee Street Route 80 |
Full | Striping Operation | All | 1 | |
| EB | R27.12 R28.076 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Allison Drive Orange Dr |
Lane | Striping Operation | #4, Right Shoulder | 4 | |
| EB | R26.022 R26.022 |
11/30/2026 07:01 PM | 12/01/2026 05:59 AM | Route 80 Davis St |
Full | Striping Operation | All | 1 | |
| WB | 1.85 1.85 |
11/30/2026 08:01 PM | 12/01/2026 05:59 AM | Route 80 Lincoln Rd W/San Miguel Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.233 3.233 |
11/30/2026 08:01 PM | 12/01/2026 05:59 AM | Route 80 Springs Rd |
Full | Sign Work | All | 1 | |
| WB | 2.881 2.881 |
11/30/2026 08:01 PM | 12/01/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | 20.925 20.925 |
11/30/2026 08:01 PM | 12/01/2026 05:59 AM | Route 80 N Fairfield |
Full | Striping Operation | All | 1 | |
| EB | R26.306 R26.306 |
11/30/2026 08:01 PM | 12/01/2026 04:59 AM | Cliffside Dr Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | R26.608 R26.608 |
11/30/2026 09:01 PM | 12/01/2026 04:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| WB | 6.814 5.634 |
12/01/2026 09:01 AM | 12/01/2026 05:01 PM | Hunter Hill Rest Area Route 37 |
Lane | Median Barrier Work | #4, Right Shoulder | 4 | |
| WB | 4.432 4.432 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| WB | R26.608 R26.608 |
12/01/2026 07:01 PM | 12/02/2026 04:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| EB | R25.862 R25.862 |
12/01/2026 07:01 PM | 12/02/2026 04:59 AM | Hickory Lane Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | 3.3 3.3 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 1.776 1.776 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Magazine St |
Full | Striping Operation | All | 1 | |
| WB | 3.597 3.597 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| EB | 4.432 4.432 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | 4.502 4.502 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 WB Redwood St/EB Redwood Pkwy |
Full | Striping Operation | All | 1 | |
| EB | 1.73 1.73 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 MAGAZINE STREET |
Full | Striping Operation | All | 1 | |
| EB | R26.022 R26.022 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Davis St Route 80 |
Full | Striping Operation | All | 1 | |
| EB | 3.597 3.597 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 4.432 4.432 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | R28.076 R28.076 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Orange Dr |
Full | Striping Operation | All | 1 | |
| WB | 1.26 1.26 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Maritime Academy Rd |
Full | Striping Operation | All | 1 | |
| EB | 2.446 2.446 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 BENICIA ROAD |
Full | Striping Operation | All | 1 | |
| EB | 1.238 1.238 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Sequoia Ave |
Full | Striping Operation | All | 1 | |
| EB | 2.881 2.881 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | 3.444 3.444 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Humbolt St/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 23.958 23.958 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Pena Adobe Rd/Pleasants Valley Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.494 3.494 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Tennessee Street Route 80 |
Full | Striping Operation | All | 1 | |
| EB | R27.12 R28.076 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Allison Drive Orange Dr |
Lane | Striping Operation | #4, Right Shoulder | 4 | |
| EB | R26.022 R26.022 |
12/01/2026 07:01 PM | 12/02/2026 05:59 AM | Route 80 Davis St |
Full | Striping Operation | All | 1 | |
| WB | 1.85 1.85 |
12/01/2026 08:01 PM | 12/02/2026 05:59 AM | Route 80 Lincoln Rd W/San Miguel Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.233 3.233 |
12/01/2026 08:01 PM | 12/02/2026 05:59 AM | Route 80 Springs Rd |
Full | Sign Work | All | 1 | |
| WB | 2.881 2.881 |
12/01/2026 08:01 PM | 12/02/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | 20.925 20.925 |
12/01/2026 08:01 PM | 12/02/2026 05:59 AM | Route 80 N Fairfield |
Full | Striping Operation | All | 1 | |
| EB | R26.306 R26.306 |
12/01/2026 08:01 PM | 12/02/2026 04:59 AM | Cliffside Dr Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | 15.391 17.347 |
12/01/2026 09:01 PM | 12/02/2026 04:01 AM | Route 12 (Rio Vista) W. Texas St. |
0 | Lane | Electrical Work | #5, #6, Right Shoulder | 5 |
| EB | R26.608 R26.608 |
12/01/2026 09:01 PM | 12/02/2026 04:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| WB | 16.134 14.42 |
12/01/2026 09:01 PM | 12/02/2026 04:01 AM | Chadbourne Rd Cordelia Truck Scales |
0 | Lane | Electrical Work | #6, #7, Right Shoulder | 6 |
| WB | 19.345 17.917 |
12/01/2026 09:01 PM | 12/02/2026 04:01 AM | Waterman Blvd/Airbase Pkwy Travis Blvd |
0 | Lane | Electrical Work | #4, #5, Right Shoulder | 5 |
| WB | 6.814 5.634 |
12/02/2026 09:01 AM | 12/02/2026 05:01 PM | Hunter Hill Rest Area Route 37 |
Lane | Median Barrier Work | #4, Right Shoulder | 4 | |
| WB | 4.432 4.432 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| WB | R26.608 R26.608 |
12/02/2026 07:01 PM | 12/03/2026 04:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| EB | R25.862 R25.862 |
12/02/2026 07:01 PM | 12/03/2026 04:59 AM | Hickory Lane Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | 3.3 3.3 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 1.776 1.776 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Magazine St |
Full | Striping Operation | All | 1 | |
| WB | 3.597 3.597 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| EB | 4.432 4.432 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | 4.502 4.502 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 WB Redwood St/EB Redwood Pkwy |
Full | Striping Operation | All | 1 | |
| EB | 1.73 1.73 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 MAGAZINE STREET |
Full | Striping Operation | All | 1 | |
| EB | R26.022 R26.022 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Davis St Route 80 |
Full | Striping Operation | All | 1 | |
| EB | 3.597 3.597 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 4.432 4.432 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | R28.076 R28.076 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Orange Dr |
Full | Striping Operation | All | 1 | |
| WB | 1.26 1.26 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Maritime Academy Rd |
Full | Striping Operation | All | 1 | |
| EB | 2.446 2.446 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 BENICIA ROAD |
Full | Striping Operation | All | 1 | |
| EB | 1.238 1.238 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Sequoia Ave |
Full | Striping Operation | All | 1 | |
| EB | 2.881 2.881 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | 3.444 3.444 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Humbolt St/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 23.958 23.958 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Pena Adobe Rd/Pleasants Valley Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.494 3.494 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Tennessee Street Route 80 |
Full | Striping Operation | All | 1 | |
| EB | R27.12 R28.076 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Allison Drive Orange Dr |
Lane | Striping Operation | #4, Right Shoulder | 4 | |
| EB | R26.022 R26.022 |
12/02/2026 07:01 PM | 12/03/2026 05:59 AM | Route 80 Davis St |
Full | Striping Operation | All | 1 | |
| WB | 1.85 1.85 |
12/02/2026 08:01 PM | 12/03/2026 05:59 AM | Route 80 Lincoln Rd W/San Miguel Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.233 3.233 |
12/02/2026 08:01 PM | 12/03/2026 05:59 AM | Route 80 Springs Rd |
Full | Sign Work | All | 1 | |
| WB | 2.881 2.881 |
12/02/2026 08:01 PM | 12/03/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | 20.925 20.925 |
12/02/2026 08:01 PM | 12/03/2026 05:59 AM | Route 80 N Fairfield |
Full | Striping Operation | All | 1 | |
| EB | R26.306 R26.306 |
12/02/2026 08:01 PM | 12/03/2026 04:59 AM | Cliffside Dr Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| WB | 16.134 14.42 |
12/02/2026 09:01 PM | 12/03/2026 04:01 AM | Chadbourne Rd Cordelia Truck Scales |
0 | Lane | Electrical Work | #6, #7, Right Shoulder | 6 |
| EB | 15.391 17.347 |
12/02/2026 09:01 PM | 12/03/2026 04:01 AM | Route 12 (Rio Vista) W. Texas St. |
0 | Lane | Electrical Work | #5, #6, Right Shoulder | 5 |
| WB | 19.345 17.917 |
12/02/2026 09:01 PM | 12/03/2026 04:01 AM | Waterman/Air Base Pkwy Travis Blvd |
0 | Lane | Electrical Work | #4, #5, Right Shoulder | 5 |
| EB | R26.608 R26.608 |
12/02/2026 09:01 PM | 12/03/2026 04:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| WB | 6.814 5.634 |
12/03/2026 09:01 AM | 12/03/2026 05:01 PM | Hunter Hill Rest Area Route 37 |
Lane | Median Barrier Work | #4, Right Shoulder | 4 | |
| WB | 4.432 4.432 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| WB | R26.608 R26.608 |
12/03/2026 07:01 PM | 12/04/2026 04:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| EB | R25.862 R25.862 |
12/03/2026 07:01 PM | 12/04/2026 04:59 AM | Hickory Lane Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | 3.3 3.3 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 1.776 1.776 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Magazine St |
Full | Striping Operation | All | 1 | |
| WB | 3.597 3.597 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| EB | 4.432 4.432 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | 1.73 1.73 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 MAGAZINE STREET |
Full | Striping Operation | All | 1 | |
| EB | 4.502 4.502 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 WB Redwood St/EB Redwood Pkwy |
Full | Striping Operation | All | 1 | |
| EB | R26.022 R26.022 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Davis St Route 80 |
Full | Striping Operation | All | 1 | |
| EB | 3.597 3.597 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 4.432 4.432 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | R28.076 R28.076 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Orange Dr |
Full | Striping Operation | All | 1 | |
| WB | 1.26 1.26 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Maritime Academy Rd |
Full | Striping Operation | All | 1 | |
| EB | 2.446 2.446 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 BENICIA ROAD |
Full | Striping Operation | All | 1 | |
| EB | 1.238 1.238 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Sequoia Ave |
Full | Striping Operation | All | 1 | |
| EB | 2.881 2.881 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | 3.444 3.444 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Humbolt St/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 23.958 23.958 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Pena Adobe Rd/Pleasants Valley Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.494 3.494 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Tennessee Street Route 80 |
Full | Striping Operation | All | 1 | |
| EB | R27.12 R28.076 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Allison Drive Orange Dr |
Lane | Striping Operation | #4, Right Shoulder | 4 | |
| EB | R26.022 R26.022 |
12/03/2026 07:01 PM | 12/04/2026 05:59 AM | Route 80 Davis St |
Full | Striping Operation | All | 1 | |
| WB | 1.85 1.85 |
12/03/2026 08:01 PM | 12/04/2026 05:59 AM | Route 80 Lincoln Rd W/San Miguel Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.233 3.233 |
12/03/2026 08:01 PM | 12/04/2026 05:59 AM | Route 80 Springs Rd |
Full | Sign Work | All | 1 | |
| WB | 2.881 2.881 |
12/03/2026 08:01 PM | 12/04/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | 20.925 20.925 |
12/03/2026 08:01 PM | 12/04/2026 05:59 AM | Route 80 N Fairfield |
Full | Striping Operation | All | 1 | |
| EB | R26.306 R26.306 |
12/03/2026 08:01 PM | 12/04/2026 04:59 AM | Cliffside Dr Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | R26.608 R26.608 |
12/03/2026 09:01 PM | 12/04/2026 04:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| WB | 6.814 5.634 |
12/04/2026 09:01 AM | 12/04/2026 05:01 PM | Hunter Hill Rest Area Route 37 |
Lane | Median Barrier Work | #4, Right Shoulder | 4 | |
| WB | 4.432 4.432 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | R25.862 R25.862 |
12/04/2026 07:01 PM | 12/05/2026 04:59 AM | Hickory Lane Route 80 |
Lane | Bridge Construction | #1 | 1 | |
| EB | 3.3 3.3 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 1.776 1.776 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Magazine St |
Full | Striping Operation | All | 1 | |
| WB | 3.597 3.597 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| EB | 4.432 4.432 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| EB | 1.73 1.73 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 MAGAZINE STREET |
Full | Striping Operation | All | 1 | |
| EB | 4.502 4.502 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 WB Redwood St/EB Redwood Pkwy |
Full | Striping Operation | All | 1 | |
| EB | 3.597 3.597 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Admiral Callaghan Lane/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 4.432 4.432 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Redwood St |
Full | Striping Operation | All | 1 | |
| WB | 1.26 1.26 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Maritime Academy Rd |
Full | Striping Operation | All | 1 | |
| EB | 2.446 2.446 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 BENICIA ROAD |
Full | Striping Operation | All | 1 | |
| EB | 1.238 1.238 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Sequoia Ave |
Full | Striping Operation | All | 1 | |
| EB | 2.881 2.881 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | R26.608 R26.608 |
12/04/2026 07:01 PM | 12/05/2026 07:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| WB | 3.444 3.444 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Humbolt St/Tennessee St |
Full | Striping Operation | All | 1 | |
| WB | 23.958 23.958 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Pena Adobe Rd/Pleasants Valley Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.494 3.494 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Tennessee Street Route 80 |
Full | Striping Operation | All | 1 | |
| EB | R27.12 R28.076 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Allison Drive Orange Dr |
Lane | Striping Operation | #4, Right Shoulder | 4 | |
| EB | R26.022 R26.022 |
12/04/2026 07:01 PM | 12/05/2026 05:59 AM | Route 80 Davis St |
Full | Striping Operation | All | 1 | |
| WB | 1.85 1.85 |
12/04/2026 08:01 PM | 12/05/2026 05:59 AM | Route 80 Lincoln Rd W/San Miguel Rd |
Full | Striping Operation | All | 1 | |
| WB | 3.233 3.233 |
12/04/2026 08:01 PM | 12/05/2026 05:59 AM | Route 80 Springs Rd |
Full | Sign Work | All | 1 | |
| WB | 2.881 2.881 |
12/04/2026 08:01 PM | 12/05/2026 05:59 AM | Route 80 Georgia St |
Full | Guardrail Work | All | 1 | |
| WB | 20.925 20.925 |
12/04/2026 08:01 PM | 12/05/2026 05:59 AM | Route 80 N Fairfield |
Full | Striping Operation | All | 1 | |
| EB | R26.022 R26.022 |
12/04/2026 08:01 PM | 12/05/2026 05:59 AM | Davis St Route 80 |
Full | Striping Operation | All | 1 | |
| EB | R28.076 R28.076 |
12/04/2026 08:01 PM | 12/05/2026 05:59 AM | Route 80 Orange Dr |
Full | Striping Operation | All | 1 | |
| EB | R26.608 R26.608 |
12/04/2026 09:01 PM | 12/05/2026 04:59 AM | Ulatis Creek Bridge | Lane | Bridge Construction | #1 | 4 | |
| EB | R26.306 R26.306 |
12/04/2026 09:01 PM | 12/05/2026 07:59 AM | Cliffside Dr Route 80 |
Lane | Bridge Construction | #1 | 1 | |